1. Installation location:
Before laying floor tiles and wall tiles, it is necessary to confirm the installation position of the bathroom cabinet; since the installation of the bathroom cabinet requires drilling holes in the wall, water inlet holes and drainage holes are also required. Once installed, the position cannot generally be moved. Therefore, confirming the installation position of the bathroom cabinet is a prerequisite before installation.
2. The shape and size of the bathroom cabinet:
After the position of the bathroom cabinet is determined, the shape and size of the bathroom cabinet can only be determined according to the installation position. When buying a bathroom cabinet, you should first measure the length and width of the reserved bathroom cabinet, and buy it according to this size.
3. The pipeline diagram of the water pipe and the wiring diagram of the electric wire:
When installing, punch holes in the wall with an air drill, so it is very important to confirm the pipeline diagram and wiring diagram before installation. If the water pipe or wire wiring diagram is broken, part of the wall bricks must be pryed open, causing unnecessary losses.
4. The accessories and installation of each bathroom cabinet are different:
That is to say, the punching size (the size of the hole opening to the wall) of the same model is also different, so it can generally be installed according to the instructions, but the installation process is basically the same.








