1. Lightning protection grounding does not meet the requirements
1. Phenomenon
(L) There are defects such as slag inclusion, weld bead, false welding, meat biting, insufficient weld seam, etc. at the lap joint of the down conductor, equalizing ring, and lightning protection belt.
(2) The welding slag will not be knocked off, and the welding place on the lightning protection belt will not be painted with anti-rust paint.
(3) Use rebar instead of round steel as lap reinforcement.
(4) Directly use the butt-welded main steel bars for lightning protection.
2. Reason analysis
(1) The operators are not strong in sense of responsibility and unskilled in welding technology. Most of them are generalist welders in the electrician class, and they have poor operating skills in vertical welding.
(2) The on-site construction manager is not strong enough to implement the relevant provisions of the National Construction and Acceptance Code GB501692 "Grounding Device".
3. Preventive measures
(L) Strengthen the skill training of welders, requiring full, smooth and even weld seams at lap welds, especially training on difficult welding such as vertical welding and overhead welding.
(2) Strengthen the sense of responsibility of management personnel and welders, repair unqualified welds in time, knock off welding slag, and brush anti-rust paint in time.
(3) According to GB501692 "Electrical Device Installation Engineering Grounding Device Construction and Acceptance Specification", the connection of the lightning down conductor is lap welding, and the lap length is 6 times the diameter of the round steel. Therefore, it is not allowed to use rebar instead. Round steel is used as lap reinforcement. In addition, if the civil construction of the main steel bar as the down-conductor is butt-welded, the overlapped round steel should be repaired at the butt-welded place according to the regulations.
2. Pre-processing of outdoor household entrance management does not meet the requirements
l. Phenomenon
(1) Use thin-walled copper pipes instead of thick-walled steel pipes.
(2) The embedded depth is not enough and the position deviation is large.
(3) Electric welding is used to bend the turning point, and the upper wall pipe and the horizontal inlet pipe network are electrically welded to form a 90° angle.
(4) The waterproofing treatment of the entrance pipe and the basement exterior wall is not good.
2. Reason analysis
(L). Material purchasers are not familiar with national norms and standards when purchasing, and some construction units deliberately confuse to reduce costs; construction managers are not strict or dare not object to the contractor’s deliberate violations, and do not resolutely implement the norms and standards. Standards; there are loopholes in the management of materials entering the site by the supervisors.
(2) Insufficient coordination with civil engineering and other professional teams.
(3) There is no pipe bender or not knowing how to use a pipe bender, the sense of responsibility is not strong, and it is easy to bend with electric welding.
(4) Workers who pre-embed the household pipe do not understand waterproof technology, and do not ask waterproof professionals for help.
3. Preventive measures
(L). Thick-walled copper pipes or PVC pipes that meet the requirements must be used for the pre-embedded pipes in the house (generally, the wall thickness of PVCΦl14 is 4.5mm or more, and Φ56 is 3mm meters).
(2) Strengthen the coordination and cooperation with civil engineering and other related professions, clarify the outdoor floor elevation, and ensure that the buried depth of the embedded pipe is not less than 0.7 meters.
(3) Strengthen the education of the relevant laws and regulations for the leaders of the contracting team and the material purchasers, and the supervisors must strictly implement the requirement that materials must be inspected when entering the site to plug the loopholes.
(4) The elbow on the wall of the pre-embedded steel pipe must be bent with a pipe bender, welding and welding bending are not allowed. After the steel pipe is bent, there should be no cracks and obvious dents. The bending procedure should not be greater than 10% of the outer diameter of the pipe, and the bending radius should not be less than the minimum allowable bending radius of the cable inserted.
(5) Do a good job of waterproofing, please instruct waterproofing professionals on site or have a waterproofing professional team do waterproofing.
3. The laying of electric wire pipes (steel pipes, PVC pipes) does not meet the requirements
1. Phenomenon
(1) The cable tube overlaps in multiple layers, and there is a gluten that is higher than the steel bar.
(2). 2 or more wires and tubes are arranged side by side.
(3) The buried depth of the wire and tube is too shallow, even buried in the powder layer outside the wall. The pipe appears dead bends, painful bends, and dents.
(4) The wire pipe enters the distribution box, and the pipe mouth is not filled smoothly in the box, and the pipe mouth is too long; the pipe mouth is uneven and the length is different; the pipe mouth does not need a protective ring; it is not tightly locked.
(5) When pre-embedding PVC electric wire pipes, instead of plugging the pipes, use clamps to flatten the elbows.
2. Reason analysis
(1) The construction personnel are not familiar with the relevant regulations, work sloppy attitudes, and are greedy for convenience, and do not follow the regulations. The management of the construction manager is not in place.
(2) Insufficient cooperation between architectural design layout and electrical professional, resulting in multiple lines passing through the same narrow plane.
3. Preventive measures
(1) Strengthen the quality control of on-site construction personnel during the construction process, and conduct targeted training for workers; management personnel should be familiar with relevant regulations and strictly manage.
(2) Multi-layer overlapping of electric wires and pipes generally appears in the public passages of high-rise buildings. When there are more than 6 sets of residences on each floor of the tower, it is recommended that the public corridor ceiling should be tightly decorated for civil construction, so that most of the incoming lines of the electric professional can directly enter the residents through the wire troughs laid on the ceiling. It is also possible to thicken the floor slab of the public walkway, so that the numerous electric wires and pipes can be concealed. Electrical professional construction personnel should try to reduce the number of overlapping layers of line pipes at the same point when laying pipes.
(3) The wire layers cannot be side by side, if it is difficult to separate them obviously during construction, they can be separated by small cement blocks.
(4) The wire and pipe are buried in the brick wall, and the distance from the surface should not be less than 15mm. The pipe should be laid "horizontally, horizontally and vertically."
(5) The bending radius of the electric wire tube (concealed burying) should not be less than 10 times the outer diameter of the tube. The tube bending machine should be used to make the bend smooth and smooth, without flat folds, dents, etc.
(6) The wire tube should be flat when entering the distribution box, and the exposed length is 3-5mm, and the tube mouth should be sheathed and the box shell should be locked. For the wire pipes that enter the floor-mounted distribution box, the nozzle should be 50-80mm higher than the base surface of the distribution box.
(7) When pre-embedded PVC electric wires and pipes, it is forbidden to flatten or bend the pipe mouth with pliers, and use a PVC plug head conforming to the pipe diameter to cover the pipe mouth and bind it firmly with tape.
Fourth, the wire connection, connection quality and color code do not meet the requirements
1. Phenomenon
(L) Multi-strand wires do not use copper joints, and are directly made into a "sheep eye" shape, but do not expand the tin.
(2) When connecting to the terminals of switches, sockets and distribution boxes, connect several wires to one terminal.
(3) The wire ends are exposed, the wires are not arranged neatly, and there is no binding.
(4) The color code of the three-phase, neutral line (N line), and grounding protection line (PE line) of the wires is inconsistent or mixed.
2. Reason analysis
(L) The construction personnel are not proficient in the wiring technology and technology of the wires.
(2) The material purchaser did not prepare the various wire colors and quantities required for construction as required, or the construction management personnel mixed them in order to save materials.
3. Preventive measures
(L) Strengthen the training of construction personnel on norms and skills.
(2) The connection of multi-strand wires should be crimped with galvanized copper joints. Try not to make a "goat eye" shape. If so, they should be tinned evenly.
(3) There should only be one wire connection between the terminal and the terminal. If two wires are needed, a flat gasket should be added in the middle; connection of more than 3 wires is not allowed.
(4) The wire arrangement should be horizontal and vertical. When stripping the wire head, keep the length of each wire head the same. After the wire is inserted into the terminal, there should be no exposed conductor; the copper joint and the wire connection should be wrapped with insulating tape of the same color as the wire. (5) The material purchasing personnel must be equipped with wires of various colors according to the needs of the site.
(6) The construction personnel should clearly distinguish the role of the phase line, the neutral line (N line), and the ground protection line (PE line) from the color code, that is, PA phase-yellow, B phase-green, and C phase-red; single In general, red should be used in phase; light blue or blue should be used for the neutral line (N line); the grounding protection line (PC level) must be a yellow-green double-color wire.
Five, the installation and wiring of the distribution box do not meet the requirements
l. Phenomenon
(L) There is a gap between the box body and the wall, and the box body is not straight.
(2) The mortar and debris in the box have not been cleaned up.
(3) The opening of the box shell does not meet the requirements, especially the opening by electric welding or gas welding, which will seriously damage the paint protection layer of the box and damage the appearance of the box.
(4) The grounding of the grounded power box is not obvious (it is not easy to find when it is placed under the box), and the cross section of the repeated grounding wire is not enough. The wires in the box are exposed, the wiring is not neat, and there is no allowance for the wires.
2. Reason analysis
(L) When installing the box, it is not matched with the civil works, the civil works are not full, and the box is installed without using the level to adjust the level.
(2) Carefully clean up the mortar debris in the box.
(3) When the "knock-off hole" of the box body does not match the inlet pipe, it must be mechanically opened or sent back to the manufacturer for reprocessing, or strictly calibrated when ordering, and produced according to the size.
(4) Strengthen inspection and supervision, and enhance the sense of responsibility of construction personnel.
(5) Thoroughly understand the relevant grounding regulations of the acceptance department. According to the requirements of the power supply department and the municipal quality inspection station, the box grounding and wires of the power box must be clearly exposed, and no welding or wiring under the box. The grounding wire is in accordance with the specification. When the phase line section of the device is S≤16mm2, the minimum section of the grounding wire is S; when 16<S≤35mm2, the minimum section of the grounding wire is 16mm2; when S>35mm2, the minimum section of the grounding wire For S/2.
(6). The thread ends in the box should be unified, not exposed, the wiring should be neat and beautiful, and the binding should be fixed, and there should be a certain margin for the wire. Generally, there should be a margin of 10-5CM in the box.
The installation and wiring of the box and panel of the switch and socket do not meet the requirements
1. Phenomenon
(1) The pre-embedded wire box is too deep, and the elevation is different; there is a gap between the panel and the wall, and the panel is contaminated with glue paint and is not straight.
(2) There are mortar debris left in the wire box.
(3) The phase wires, neutral wires and PE protection wires of switches and sockets are connected in series.
(4) The wire ends of the switches and sockets are exposed, the fixing bolts are loose, and the wire allowance in the box is insufficient.
2. Reason analysis
(1) The pre-embedded wire box is not firmly fixed, the template is expanded, and the coordinates are not accurate during installation.
(2) The construction personnel have a weak sense of responsibility, lack of understanding of the importance of the safety of electrical appliances, and are greedy for convenience.
(3) There is an unreasonable idea of saving materials.
3. Preventive measures
(1) Work closely with the civil engineering profession to accurately and securely fix the wire box; when the embedded wire box is too deep, a wire box should be installed. When installing the panel, it should be horizontal and vertical, and the level should be adjusted with a spirit level to ensure the uniformity of the installation height. In addition, after installing the panel, fill up the seams completely, no gaps are allowed, and clean and protect the panel.
(2) Strengthen management and supervision to ensure that the phase wires, neutral wires and PE protection wires in switches and sockets cannot be connected in series. Clean the mortar in the box first.
(3) When stripping the wire, fix the size to ensure that the wire ends are neat and uniform, and the wire ends are not exposed after installation; at the same time, in order to firmly compress the wires, the single-core wire should be twisted into double strands when inserted into the wire hole, and tighten and tighten with screws.
(4) The wires in the switch and socket box should have a certain margin, generally 100-150mm is appropriate; we must resolutely put an end to unreasonable material saving greed.
Seven, the installation of lamps and ceiling fans does not meet the requirements
1. Phenomenon
(L) The lamp position is installed off-site, not at the center point.
(2) The horizontality and straightness deviation of the rows of lamps is relatively large.
(3) The chain of the fluorescent lamp is not parallel, and the lead wire is not braided.
(4) The hook of the ceiling fan is made of threaded steel, which is poorly formed; the bell is not ceiling-mounted, and the junction box is exposed.
(5) The iron plate of the balcony lamp chassis falls off and rusts.
(6) The simple lamp on the ceiling of the ceiling has large openings and irregularities.
2. Reason analysis
(L) The position of the pre-embedded lamp box is wrong, there is deviation, and no remedial measures are taken when installing the lamp.
(2) The constructor has a weak sense of responsibility and is not familiar with the current construction and acceptance specifications, and quality inspection and evaluation standards.
(3) When purchasing lamps and lanterns, the buyer is greedy to make publicity and ignores the quality;
(4) The size, ethnic position, and diameter of the circular hole are not uniform when the downlight is opened.
3. Preventive measures
(L) Before installing the lamp, the center point should be carefully identified and the deviation should be corrected in time.
(2) According to the specification, the deviation of the installation of a row of lamps should not be greater than 5mm. Therefore, it is necessary to pull the wire positioning during the construction, so that the lamps are in a straight line in the vertical, horizontal, oblique, and main level.
(3) The hanging chains of fluorescent lamps should be straight with each other, no figure eight should appear, and the lead wires should be braided together with the hanging chains.
(4) When pre-embedded ceiling fan hooks, galvanized round steel no less than Ф8 should be used to fix them with the steel bars in the plate. Rebar is not allowed. The hooks should be processed in the same shape and painted with anti-rust paint. The bell cover of the ceiling fan can ceiling and cover the hook and junction box. The rows of ceiling fans should be in a straight line with deviation ≤5mm.
(5) The thickness of the iron plate of the bottom box of the balcony lamp is ≥0.5mm, and the paint surface is even and smooth, which can effectively prevent rust; the glass cover should not be too thin to avoid cracking during installation.
(6) The coordinates of the downlight opening of the ceiling ceiling should be determined first. Except for straight, neat and equal requirements, the size of the opening should meet the specifications of the downlight, and it should not be too large to ensure that the outer ring of the downlight is firmly installed. The ground is close to the ceiling, no gaps are exposed.
(7) Construction personnel and procurement personnel must earnestly implement relevant national and local regulations.
8. The installation of cables and busbars does not meet the requirements
l. Phenomenon
(L) After the cables are installed, they are not uniformly listed, and the cables are laid disorderly in the cable trenches and bridges.
(2) In the shaft, the cable hole is not tightly blocked; the bracket for vertically fixing the cable is too small, too soft, and inclined downward.
(3) The cable is not tightly sealed after passing through the entrance pipe.
(4) The wiring terminal (wire lug) is too large or too small, the wall is too thin, and it breaks when the connector is pressed.
(5) The installation of the plug-in box of the busbar is not straight, and the busbars of each section are too long, which is not easy to transport and install.
2. Reason analysis
(1) The cable construction units have not coordinated well, and only the cables laid by themselves can pass.
(2) There is no good coordination with the civil engineering unit when plugging the strong electric shaft, and the construction personnel do not master the plugging technology.
(3) The material is not up to standard, and the purchaser does not purchase the cable fixing bracket and the terminal (wire lug) according to the standard.
(4) The area of the construction major for the electrical major to make the strong electric shaft is too small, which makes the layout of the strong electric shaft difficult.
3. Preventive measures
(1) The cable construction team must coordinate well, arrange the large and small cables in the direction and position respectively, and use the moisture-proof and anti-corrosion card to list after the installation, and indicate the line number, model, specification and origin of all kinds of cables. point. The listing positions are: cable terminal end, corners, inside the mezzanine, both ends of the shaft, hand-crafted holes in the cable trench, etc.
(2) Use hemp and bitumen mixture to block the openings through which the shaft cables pass. When there are outdoor entrance pipes to the basement, the pipe openings should be waterproofed. These tasks need to be closely coordinated with the civil engineering profession. Clean up the site after blocking.
(3) When purchasing materials such as cable brackets, wiring terminals (wire lugs), etc. in the purchasing room, they must be purchased in accordance with the specifications. When crimping the joint, accurately select the corresponding hydraulic pliers and the corresponding kit.
(4) When ordering busbars, it must be ensured that each busbar section shall not be greater than the height of each floor; generally, it shall not be greater than 3 meters to facilitate transportation and installation in the building.
(5) When busbars and accessories enter the site, they must strictly comply with GBJ149-90 "Code for Construction and Acceptance of Electrical Installation Engineering Busbar Devices" and contract inspection.
If you are interested in our products, please visit www.hkram.com to have more information.